When process demand approaches your agreed grid
import limit, reducing output can affect throughput,
quality and waste. Exceeding agreed limits may
expose the site to additional charges or other
consequences under its connection and supply
arrangements.
A suitably sized and controlled FAB offers another
option: draw electricity from the grid within the
agreed limit and supplement it with locally banked
energy. This can help the process maintain its
intended operating rate without drawing all of
that power through the grid connection.
The benefit is additional power available on site
during the required period, rather than an increase
in the physical capacity of the grid connection.
The design must account for discharge power,
stored energy, peak duration and the opportunity
to recharge between peaks.
Assess electrical connections, internal distribution,
equipment positioning and service access alongside
current demand and future production plans.